Eaton vs Schneider vs Siemens vs ABB: Data Center Switchgear Compared (2026)

Updated November 2026. The short answer: Eaton, Schneider Electric, Siemens and ABB all build credible data center switchgear, and in 2026 the deciding factor is usually the delivery slot, not the brand. Medium-voltage lineups are quoting roughly a year to a year and a half. Eaton offers the most bundled power-room option (it bought modular-enclosure maker Fibrebond in 2025). Schneider has the most interesting new technology (software-defined medium-voltage gear, piloting at Equinix). Siemens is strongest in generator paralleling and prefabricated skids. ABB is the pick where arc-resistant medium-voltage gear is specified. Confirm US listings for any IEC-origin product before it goes on a submittal.

Quick answer

FactorEatonSchneider ElectricSiemensABB
Core US gearMagnum DS low-voltage; VacClad-W metal-clad medium-voltage; Xiria SF6-free secondary gearSquare D Power-Zone 4 low-voltage with MasterPacT MTZ breakers; Masterclad metal-clad medium-voltage; Premset and SM AirSeT SF6-freeWL low-voltage switchgear; GM-SG and GM-SG-AR (arc-resistant) medium-voltage; Russelectric paralleling and transfer gearEmax low-voltage breakers (Emax 3 line coming in Mississippi); SafeGear arc-resistant and ReliaGear medium-voltage
Recent dealsFibrebond (closed April 2025, $1.4B); Resilient Power Systems (August 2025); Boyd Thermal (closed March 2026, $9.5B)Motivair majority stake (closed February 2025; liquid cooling, not switchgear)Compass Datacenters agreement: up to 1,500 prefabricated medium-voltage skids over five years (December 2024)No switchgear acquisition found in the period; GE Industrial Solutions (2018) remains the basis of its US installed base
US capacity newsBellevue, Nebraska medium-voltage plant ($30M+, production first half 2027); Richmond, Virginia campus ($50M+, 2027)More than $700M US investment through 2027 (El Paso, Welcome NC, Mt. Juliet TN, Columbia MO)$165M+ Carolinas expansion (switchgear in Wendell NC, done by 2028); $30M Virginia switchgear plant with Jabil (production fall 2026); $185M low-voltage plant in Pendergrass, Georgia (hiring 2027)$110M across four US plants (September 2025), including a $15M Emax 3 line in Senatobia, Mississippi
Best fitWhole power rooms in prefab enclosuresLow-voltage breaker intelligence; SF6-free roadmapGenerator paralleling and transfer; prefabricated medium-voltage skidsArc-resistant medium-voltage

The scorecard

Editorial ratings, 1 to 5, based on public capacity announcements, product lineups, published lead-time trackers and owner feedback. Nobody pays for placement on DataCenterUPS.

US capacity & lead-time outlookLow-voltage switchgearMedium-voltage & arc-resistantPrefab power roomsSF6-free (US-ready)Data center track record & serviceTotal /30
Eaton4.54.5453.5526.5
Schneider Electric4.5543.544.525.5
Siemens4.544.543.54.525
ABB3.54534423.5

Tier 1 — spec with confidence: Eaton (the one-vendor power room) and Schneider Electric (the low-voltage intelligence leader with the clearest SF6-free roadmap).
Tier 2 — right tool for the right job: Siemens (paralleling, transfer and prefabricated medium-voltage skids) and ABB (arc-resistant medium-voltage, thinner US data center bench).
Situational: Powell Industries for large medium-voltage lineups and e-houses, Vertiv for microgrid switchgear tied to its UPS and cooling, GE Vernova where transformers and switchgear come from one supplier.

Eaton

Eaton has made the biggest structural bets of the four. It closed the $1.4 billion Fibrebond acquisition on April 1, 2025, adding factory-integrated modular power enclosures (e-houses) built in Minden, Louisiana. In August 2025 it closed Resilient Power Systems, an Austin developer of medium-voltage solid-state transformers, and on March 12, 2026 it closed the $9.5 billion Boyd Thermal deal, which brings liquid cooling. For switchgear buyers, Fibrebond is the relevant piece: Eaton can now quote a tested, pre-wired power room instead of loose gear, which trades site labor for factory schedule.

Magnum DS is Eaton’s long-running low-voltage data center switchgear and VacClad-W its US metal-clad medium-voltage line (5 to 15 kV). Xiria is the SF6-free medium-voltage product (vacuum-switched, up to 24 kV), a secondary-distribution design rather than primary lineup gear, so confirm the US listing for the configuration you need. On capacity, Eaton announced a $30 million-plus, 370,000-square-foot medium-voltage switchgear plant in Bellevue, Nebraska in April 2026, with production expected in the first half of 2027, alongside a $50 million-plus campus near Richmond, Virginia on the same timeline. Demand is running ahead of that: Eaton’s Electrical Americas orders were up 41% and backlog up 33% in its second-quarter 2026 results. New capacity helps 2027 orders, not today’s.

Schneider Electric

Schneider’s US data center switchgear comes through its Square D brand: Power-Zone 4 low-voltage switchgear built around MasterPacT breakers, and Masterclad metal-clad medium-voltage gear. The MasterPacT MTZ Active low-voltage air circuit breaker (800 to 6,300 A, introduced in 2024) adds an arc-flash maintenance setting and connected diagnostics, which is why Schneider scores highest on the low-voltage line. Premset is its shielded solid-insulation, SF6-free medium-voltage product and SM AirSeT the air-insulated alternative; check US availability and UL listing before specifying either.

The 2026 news is bigger. On September 28, 2026 Schneider unveiled what it calls the first fully software-defined medium-voltage switchgear, with protection logic separated from the hardware and updated as software, and announced RM AirSeT 38, which extends its SF6-free platform from 24 kV to 38 kV. Equinix is piloting the software-defined gear in a live colocation site, with pilots running through 2027 and broad availability expected in 2028; RM AirSeT 38 is slated to take orders in 2027 with first deliveries in 2028. Treat both as roadmap items for projects breaking ground after 2027. On capacity, Schneider announced more than $700 million of US investment through 2027 in March 2025, including switchgear expansions in El Paso, Texas and Welcome, North Carolina, a new medium-voltage facility in Mt. Juliet, Tennessee, and breakers in Columbia, Missouri. It also completed a 75% stake in liquid-cooling maker Motivair in February 2025.

Siemens

Siemens’ strongest data center angle is system-level. Russelectric, a Siemens business since 2018, builds paralleling and transfer switchgear that coordinates generators and utility feeds (built to UL 1558), and Siemens’ own GM-SG metal-clad medium-voltage line has an arc-resistant GM-SG-AR version. The clearest proof of its prefabricated approach is the Compass Datacenters agreement signed in December 2024: up to 1,500 modular medium-voltage skid units over five years, each combining 8DJH 36 gas-insulated, arc-resistant switchgear with transformers, with the first deployment planned for Compass’s Chicago-area campus. Note that 8DJH 36 is SF6 gas-insulated; the “Clean Air” SF6-free 8DJH versions are secondary-distribution ring-main units and we found no US data center deployments of those.

Siemens is adding US capacity fastest of the four in 2026. In March it announced more than $165 million across the Carolinas, including expanded switchgear production at its Wendell, North Carolina headquarters (200-plus jobs by 2028) and busway capacity in Roebuck, South Carolina. In May it announced a 300,000-square-foot medium-voltage switchgear plant in Prince George County, Virginia, operated by Jabil under a $30 million combined investment, with production slated for fall 2026. In August it announced more than $185 million for a 550,000-square-foot low-voltage plant in Pendergrass, Georgia, with hiring starting in 2027. The Virginia plant is the only one of these that affects 2026 to 2027 deliveries.

ABB

ABB’s US medium-voltage brands are SafeGear (arc-resistant metal-clad gear, 5 and 15 kV, up to 50 kA) and ReliaGear (standard construction; the low-voltage version is built to UL 1558 and ANSI C37.20.1). Its US installed base largely comes from the 2018 purchase of GE Industrial Solutions. UniGear ZS1 is a widely used air-insulated medium-voltage product with an SF6-free variant, but it is an IEC-style design, so confirm ANSI and UL suitability for a US project. ABB has also published DC-ready switchgear and UPS plans with NVIDIA for 800 VDC AI data centers.

On capacity, ABB announced $110 million across four US plants in September 2025: a $15 million Emax 3 low-voltage breaker line in Senatobia, Mississippi (expected operational in 2026), $35 million in Pinetops, North Carolina for sensors and grid-protection devices, and $30 million each in Richmond, Virginia and Arecibo, Puerto Rico. That followed a $120 million US pledge in March 2025 that included an $80 million low-voltage plant in Selmer, Tennessee. These are smaller than the Eaton, Schneider and Siemens programs and skewed to components rather than lineups, which is why ABB scores lowest on capacity outlook despite the strongest arc-resistant product.

Alternatives and adjacent approaches

  • Other manufacturers. Powell Industries is the large medium-voltage and e-house specialist: backlog of $1.8 billion at March 31, 2026 (up 33%), followed by a single data center order above $400 million, the largest in its history. GE Vernova completed its $5.275 billion buyout of the rest of transformer maker Prolec GE on February 2, 2026 and sells switchgear alongside. Vertiv completed its purchase of UtilityInnovation Group (microgrid switchgear, controls and energy storage, up to $2.6 billion) on October 27, 2026. Hitachi Energy is expanding US high-voltage breaker production in Pennsylvania. For most enterprise and colocation projects these are second-source options, not substitutes for the four above.
  • Prefabricated power modules vs stick-built rooms. Eaton (Fibrebond), Siemens (Compass skids), Powell and others sell factory-integrated power rooms; the pitch is schedule certainty and less site labor during a trade-labor shortage. We have no verified cost-savings figure, so get quotes for both routes.
  • SF6-free vs SF6 gas-insulated gear. The EU bans SF6 in new medium-voltage switchgear up to 24 kV from January 1, 2026, which is why every vendor now has an SF6-free line. In the US the rules are state-level: California’s Air Resources Board is phasing out acquisition of SF6 gas-insulated equipment under its 2021 amendments, Massachusetts begins a voltage-based phase-out in 2027, and most other states have no rule. Check the current text with the state agency if you build in California or the Northeast.
  • 800 VDC and solid-state transformers. Eaton published an 800 VDC grid-to-chip reference architecture with NVIDIA in October 2025, and ABB is working with NVIDIA on DC-ready switchgear and UPS. These remain largely pre-commercial in 2026; treat them as a roadmap item for AI factories, not a procurement option for a standard build.

What about lead times?

Lead times are the real constraint. The most-cited planning range for 15 kV-class medium-voltage switchgear in 2026 is 52 to 80 weeks depending on manufacturer and configuration, against about 24 weeks before the pandemic; 38 kV-class gear runs longer. Wood Mackenzie put high-voltage circuit breaker lead times at 125 weeks in the second half of 2025, up from 77 weeks in 2023. Every capacity announcement above lands in 2027 or 2028 except the Siemens/Jabil Virginia plant, so none of them shortens an order placed this year. No vendor publishes comparable lead times. Ask each for a written shipping week, ask whether a standard configuration ships sooner than an engineered-to-order one, and lock the slot before design is final if the schedule allows.

Which should you choose?

  • Fastest confirmed delivery slot: whichever vendor commits in writing. Ask for the shipping week, not the quoted range.
  • Whole power room, one vendor: Eaton with Fibrebond, or Powell if you prefer a specialist.
  • Generator-coordinated transfer and paralleling: Siemens through Russelectric.
  • Repeatable prefabricated medium-voltage blocks across a campus: Siemens skids or Eaton Fibrebond enclosures.
  • Arc-flash-focused low-voltage breakers: Schneider MasterPacT MTZ Active.
  • Arc-resistant medium-voltage: ABB SafeGear, or Siemens GM-SG-AR.
  • SF6-free requirement today: all four offer SF6-free medium-voltage lines, but confirm the US listing for the exact model; Schneider’s 38 kV option does not ship until 2028.

Check the standards on the submittal: UL 1558 and IEEE C37.20.1 for low-voltage switchgear, IEEE C37.20.2 for medium-voltage metal-clad, and IEEE C37.20.7 for arc-resistant construction. Also confirm the nearest field-service coverage, since none of the four publishes verifiable service-network figures for data center work.

Need an installer? Browse medium- and high-voltage electrical contractors and commissioning agents in our directory. Related reading: Vertiv vs Eaton vs Schneider UPS systems, data center generators compared, and N+1, 2N and 2N+1 redundancy.

Sources: Eaton, Fibrebond close; Eaton, Nebraska plant; Manufacturing Dive, Schneider $700M; DCD, Schneider/Equinix pilot; Engineering.com, Siemens Carolinas; T&D World, Siemens/Jabil Virginia; ConstructConnect, Siemens Georgia; ABB, $110M US investment; Powell Industries Q2 FY2026 8-K; Vertiv, UIG close; GE Vernova, Prolec GE close; Terrapin, 2026 lead times; Reuters via AJOT, Wood Mackenzie breaker lead times.

Request quotes from electrical contractors

Get matched with vetted electrical contractors — free.

Tell us about your switchgear or power distribution project and we'll connect you with up to 3 qualified firms in your state — no cost, no obligation.

By submitting, you agree to be contacted by up to 3 vetted contractors. We never sell your info. US projects only.